General Residence | PALCCOAT
General Residence
-
| Location |
Arakawa-ku, Tokyo |
| Date |
2026.02.16 |
| Coating duration |
1 day |
| Construction area |
Exterior wall (concrete) |
-
| Location |
Adachi-ku, Tokyo |
| Date |
2026.01.22 |
| Coating duration |
1 day |
| Construction area |
Exterior wall (concrete) |
-
| Location |
Chuo-ku, Tokyo |
| Date |
2025.05.31 |
| Coating duration |
1 day |
| Construction area |
Exterior wall (concrete) |
-
| Location |
Shinagawa-ku, Tokyo |
| Date |
2025.05.08 |
| Coating duration |
1 day |
| Construction area |
Exterior wall (concrete) |
-
| Location |
Koto-ku, Tokyo |
| Date |
2024.05.10 |
| Coating duration |
1 day |
| Construction area |
Exterior wall (concrete) |
-
| Location |
Edogawa-ku, Tokyo |
| Date |
2024.01.14 |
| Coating duration |
1 day |
| Construction area |
Exterior wall (concrete) |
-
| Location |
Koto-ku, Tokyo |
| Date |
2023.12.26 |
| Coating duration |
1 day |
| Construction area |
Exterior wall (concrete) |
-
| Location |
Tokyo |
| Date |
2023.08.24 |
| Coating duration |
- |
| Construction area |
Exterior wall tiles |
-
| Location |
chiba |
| Date |
2023.03.19 |
| Coating duration |
- |
| Construction area |
Exterior wall tiles |
-
| Location |
Tokyo |
| Date |
2023.03.10 |
| Coating duration |
- |
| Construction area |
Exterior wall tiles |
-
| Location |
Chiba prefecture. |
| Date |
2023.01.17 |
| Coating duration |
- |
| Construction area |
2nd floor sunroom glass |
-
| Location |
Saitama prefecture. |
| Date |
2022.12.20 |
| Coating duration |
- |
| Construction area |
Exterior wall tiles |
Copyright © 2006, SOUMA CO.,LTD. All rights Reserved.