| Location:Sumida-ku, Tokyo | Date:2022.5.12 |
| Coating duration:5 days | Construction area:Exterior wall, glass |
| Comment:- | |
The coating technology of Photocatalyst based on actual result and reliability.
| Location:Sumida-ku, Tokyo | Date:2022.5.12 |
| Coating duration:5 days | Construction area:Exterior wall, glass |
| Comment:- | |
Copyright © 2006, SOUMA CO.,LTD. All rights Reserved.